Project Details
- Client
- Village of Bellville
- Location
- Bellville
- Year
- 2024
- Status
- Completed
- Photos
- 9 photos ↓
The design included the installation of sidewalks, curb ramps, curbs and gutters, a new closed drainage system, driveway reconstruction, a gravity retaining wall with railing, signage, and pavement markings.
Extensive utility coordination was required to relocate gas mains, water mains and hydrants, underground communication lines, and overhead electric poles. Additionally, KEM prepared right-of-way plans and assisted with property acquisition and negotiations.



