Bellville Sidewalk, Phase 2

KEM provided design services from 2018 to 2020 for the $135,000 sidewalk extension project under the ODOT Local Let process.

Project Details

Client
Village of Bellville
Location
Bellville
Year
2020

The Village of Bellville sponsored this 1,400-foot-long sidewalk project, which begins at the intersection of SR 13 and SR 97 and extends north along the east side of SR 13 and Bellville North Road to the Boy Scout Park. This project was an extension of the Phase 1 sidewalk, aimed at providing a safe pedestrian path to the park. The scope of work included the construction of curbs, driveways, crosswalks, and ADA-compliant curb ramps. KEM's services encompassed field survey, field review, preliminary design, and final design. Special care was taken during the design phase to limit impacts on adjacent landscaping features and trees, minimize environmental and right-of-way impacts, and maintain surface drainage throughout the project.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053