Project Details
- Client
- Crawford County Engineer
- Location
- Crawford County
- Year
- 2021
The existing roadway had sustained significant deterioration due to heavy truck traffic generated by the National Limestone quarry located at the northern boundary of the project area. Given the daily demands of loaded trucks on the road, an ODOT Superpave mix design was chosen for its proven ability to withstand extreme temperature fluctuations and heavy traffic loads.
The project was efficiently completed in just nine working days, reflecting a streamlined and effective construction process.



