The project scope includes the demolition of the existing steel bridge and foundation, and the installation of a new 55-foot single-span prestressed non-composite concrete box beam on reinforced concrete capped pile abutments. The project also involves approximately 250 feet of new roadway construction and the installation of new approach guardrails.
Special care was taken during the design process to minimize environmental and right-of-way impacts while improving the roadway profile, stream hydraulics, and maintaining surface drainage throughout the project.