Project Details
- Client
- Richland County Engineer
- Location
- Richland County
- Year
- 2022
- Status
- Completed
- Photos
- 7 photos ↓
The project scope included the demolition of the existing steel bridge and foundation, and the installation of a new 35-foot single-span prestressed non-composite concrete box beam on reinforced concrete capped pile abutments. Additionally, the project involved approximately 200 feet of new roadway construction and the installation of new approach guardrails. Special care was taken during the design phase to minimize environmental and right-of-way impacts while improving stream hydraulics and maintaining surface drainage throughout the project.