Project Details
- Client
- City of Elyria
- Location
- Elyria
- Year
- 2019
The project included the milling and resurfacing of Chestnut Ridge Road with 1-3/4" of Type 2 Intermediate Course and 1-1/4" of Type 1 Asphalt Surface Course matching the existing profile. Shoulder work with underdrains was completed on the south side of the road and shoulder widening was performed along the north side. New sidewalk was installed on the south side of the road from Abbe Road to tie in to the existing walk approximately 1,200 east of this intersection. New pedestrian signals and traffic signal backplates were added to the Abbe Road intersection with Chestnut Ridge Road.
Part B of this project also includes the replacement of the 587.5 feet of existing guardrail and 2,250 SF of sidewalk on North Abbe Rd. under the Ohio Turnpike.