Chestnut Ridge Road Resurfacing, Elyria

KEM provided construction inspection and administration services for the $750,000 asphalt resurfacing project on Chestnut Ridge Road. The resurfacing of this project began just west of S. R. 57 and proceeded east 0.67 miles to the Elyria corporation limit.

Chestnut Ridge Road Resurfacing, Elyria

Project Details

Client
City of Elyria
Location
Elyria
Year
2019

The project included the milling and resurfacing of Chestnut Ridge Road with 1-3/4" of Type 2 Intermediate Course and 1-1/4" of Type 1 Asphalt Surface Course matching the existing profile. Shoulder work with underdrains was completed on the south side of the road and shoulder widening was performed along the north side. New sidewalk was installed on the south side of the road from Abbe Road to tie in to the existing walk approximately 1,200 east of this intersection. New pedestrian signals and traffic signal backplates were added to the Abbe Road intersection with Chestnut Ridge Road.

Part B of this project also includes the replacement of the 587.5 feet of existing guardrail and 2,250 SF of sidewalk on North Abbe Rd. under the Ohio Turnpike.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053