Project Details
- Client
- City of Elyria
- Location
- Elyria
- Year
- 2024
- Status
- Completed
- Photos
- 3 photos ↓
The project runs along Cleveland Street from East Bridge Street and Gulf Road to Hawthorne Street. It reduced Cleveland Street from four through lanes to three, with one lane in each direction and a center turn lane, and built a four-leg, non-circular roundabout at the East Bridge Street intersection.
The work included:
- Full- and partial-depth pavement repairs and resurfacing
- Replacement of deteriorated culverts and catch basins
- New underdrains
- Curb replacement with fewer curb cuts
- New sidewalk, curb ramps, crosswalks and curb bump-outs
- Traffic signal work
- Pavement markings, signage, and lighting
Resurfacing of Cleveland Street began in September 2024.
The project was funded in part with federal Highway Safety Improvement Program funds through ODOT and Surface Transportation Block Grant funds through the Northeast Ohio Areawide Coordinating Agency (NOACA).