Project Details
- Client
- Village of Sheffield
- Location
- Sheffield
- Year
- 2019
This resurfacing project included pavement planing of the entire 3" surface along with 5,600 SY of asphalt pavement repair followed by 1¾" of Type 2 Intermediate Asphalt and 1¼" of Type 1 Surface Course Asphalt. Also included was the widening of both shoulders with 8" of 301 aggregate base. After the paving was completed, spot linear grading was performed adjacent to the shoulders. The project also included 1,550 feet of guardrail replacement, new signs, and 642 pavement markings.



