East River Road Resurfacing, Sheffield

KEM provided construction inspection and administration services for the $1,012,000 asphalt resurfacing project on E. River Road from S. R. 254 north 2.90 miles to S. R. 611. This Local Let project was administered under ODOT oversight.

East River Road Resurfacing, Sheffield

Project Details

Client
Village of Sheffield
Location
Sheffield
Year
2019

This resurfacing project included pavement planing of the entire 3" surface along with 5,600 SY of asphalt pavement repair followed by 1¾" of Type 2 Intermediate Asphalt and 1¼" of Type 1 Surface Course Asphalt. Also included was the widening of both shoulders with 8" of 301 aggregate base. After the paving was completed, spot linear grading was performed adjacent to the shoulders. The project also included 1,550 feet of guardrail replacement, new signs, and 642 pavement markings.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053