Project Details
- Client
- City of Elyria
- Location
- Elyria
- Year
- 2022
- Status
- Completed
- Photos
- 14 photos ↓
The project also included approximately 200' of new multiuse path and the installation of new curb ramps at the intersection of Scott Court. Special care was taken during design to minimize impacts to existing underground utilities (gas, water, sanitary, fiber optic cable, telephone, storm sewer) while staying within the existing right of way and maintaining surface drainage throughout the project.


