Project Details
- Client
- City of Willard
- Location
- Willard
- Year
- 2025
- Status
- Completed
- Photos
- 12 photos · 1 video ↓
The existing steep embankment slope on the south side of Spring Street was eroding away at the existing inlet and exposing the existing 8″ sanitary line. This project extended the culvert, widened the graded shoulder, and flattened the embankment slope to provide cover over the sanitary. With additional shoulder width, a recovery area could be provided in the roadway clear zone, which allowed us to eliminate the guardrail treatment on the south side and remove an obstruction and maintenance feature for the city.



