Project Details
- Client
- City of Mansfield
- Location
- Mansfield
- Year
- Ongoing
Frequent breaks in the line and the inability to shut it down without causing major disruptions at the plant, combined with the need for a new well at the far end of the wellfield, highlighted the necessity for a new raw water line.
KEM developed construction plans for approximately 13,500 linear feet of waterline replacement, with pipe sizes ranging from 12 inches to 20 inches. The project began with the creation of a model and a study to identify areas for planned water main extensions. Following the completion of the model and determination of pipe sizes, KEM conducted surveys and prepared detailed construction plans for replacing the aging waterlines. Additionally, the plans included system looping to enhance fire flows and ensure improved reliability.


