Project Details
- Client
- City of Sandusky
- Location
- Sandusky
- Year
- 2022
- Status
- Completed
- Photos
- 10 photos ↓
This ODOT LPA Local-Let project involved the installation of over 1,000 feet of new 16-inch PVC watermain and 1,000 feet of 10-inch PVC sanitary sewer, complete with service lateral upgrades and infrastructure to support the future development of Battery Park.
Underground improvements addressed the elimination of combination sewers by installing a new storm sewer north of Washington Avenue. Due to the presence of shallow rock, 3,800 square yards of geogrid were utilized to stabilize the road subgrade, replacing the need for lime stabilization.
The reconstruction of Meigs Street included the replacement of the existing concrete pavement with new full-depth asphalt and the reduction of the road width from 32 feet to 22 feet north of Washington, providing traffic calming measures and incorporating on-street parallel parking.
Additionally, the project featured the construction of a 0.5-mile multi-use path from E Water Street to Sycamore Street, paving the way for future extensions throughout the city. Other enhancements included a bioswale, new curb ramps, asphalt resurfacing, underdrains, pavement markings, and new signage, contributing to a modernized and sustainable infrastructure.