Moore Road Reconstruction, Avon Lake

KEM was selected to provide construction administration, inspection, and field-testing services for the reconstruction of approximately one mile of Moore Road, extending from Walker Road to the Norfolk Southern Railroad in the City of Avon Lake.

Moore Road Reconstruction, Avon Lake

Project Details

Client
City of Avon Lake
Location
Avon Lake
Year
2022

This ODOT District 3 LPA Local Let Project involved widening Moore Road by six feet on both the east and west sides, from Walker Road to Pin Oak Parkway, enabling the addition of bike lanes throughout the corridor.

The road widening process included excavating 26 inches of existing material, the placement of geotextile fabric, and a buildup of 18 inches of 304 stone and 8 inches of asphalt concrete base. The project also integrated drainage enhancements, such as the installation of 7,500 feet of 4-inch base pipe underdrains, 18 side ditch inlets, and the regrading of swales along both sides of the roadway.

Additional improvements encompassed the removal and replacement of asphalt and concrete drive aprons, pavement resurfacing from Pin Oak Parkway to the Norfolk Southern Railroad, new signage, pavement markings, and restoration work, ensuring a safer and more functional transportation corridor.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053