The original crossing consisted of a simple two-channel, three-sided box culvert with a guardrail at the inlet and a handrail at the outlet. The new design utilizes a four-sided box culvert with the addition of inlet and outlet wing walls constructed of cast-in-place concrete with a custom sandstone veneer. The new veneer was salvaged from several demolition projects within the city. In addition to enhancing the park’s aesthetic appeal, the design captured stream flow from the channel to provide a secondary source of flow into North Lake, thereby improving water quality and reducing stagnation within the lake. The project was completed by Adena Construction Company of Mansfield.