Project Details
- Client
- City of Mount Vernon
- Location
- Mount Vernon
- Year
- 2021
The project involved the replacement of 1,560 feet of an aging 6-inch watermain with a new 8-inch watermain, along with the installation of updated hydrants and service lines.
This initiative was conducted in preparation for an ODOT District 5 stabilization project, which involved a 3-foot concrete stabilization of the existing State Route prior to asphalt placement. To accommodate the stabilization work, the existing waterline and other utilities had to be lowered, ensuring no conflicts would arise during the subsequent phases of the project.