This $1,800,000 LPA Local Let Project included the widening and minor realignment of S.R. 43 through the intersection of the Douglas Applegate Connector and Lovers Lane to improve safety. Major components of the project included 1,300 cubic yards of asphalt pavement, 400 feet of 12" and 15" storm sewer, 13 catch basins, 700 feet of 12" diameter water main, 3,900 feet of curb, 15,000 square feet of sidewalk, and new traffic signal installation.
This project was constructed in three phases. The first phase included the installation of new traffic signals and widening of the left side of S.R. 43 and the widening of both sides of the Douglas Applegate Connector. The second phase utilized the completed areas of Phase 1 to maintain two lanes of traffic while Lovers Lane construction took place under two sub-phases. The third phase of the project included the intermediate and surface courses of asphalt pavement for the entire project along with remaining permanent traffic control items including pavement markings and signs.