State Route 43, Steubenville

KEM was selected to provide construction contract administration and inspection services for the JEF-SR43-4.2 project for the City of Steubenville.

Project Details

Client
City of Steubenville
Location
Steubenville
Year
2019

This $1,800,000 LPA Local Let Project included the widening and minor realignment of S.R. 43 through the intersection of the Douglas Applegate Connector and Lovers Lane to improve safety. Major components of the project included 1,300 cubic yards of asphalt pavement, 400 feet of 12" and 15" storm sewer, 13 catch basins, 700 feet of 12" diameter water main, 3,900 feet of curb, 15,000 square feet of sidewalk, and new traffic signal installation.

This project was constructed in three phases. The first phase included the installation of new traffic signals and widening of the left side of S.R. 43 and the widening of both sides of the Douglas Applegate Connector. The second phase utilized the completed areas of Phase 1 to maintain two lanes of traffic while Lovers Lane construction took place under two sub-phases. The third phase of the project included the intermediate and surface courses of asphalt pavement for the entire project along with remaining permanent traffic control items including pavement markings and signs.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053