This initiative focused on enhancing the City’s infrastructure through the installation of new waterlines and storm sewers, as well as the construction of a new asphalt multi-use path and concrete sidewalks.
The waterline improvements included the installation of 8,302 feet of new 8-inch and 10-inch ductile iron watermains, along with new water valves, fittings, 9 fire hydrants, and upgraded water services for residents and businesses. Drainage system upgrades replaced an outdated and undersized system with 9,948 feet of 12-inch to 24-inch conduit, 939 feet of 27-inch conduit, 60 catch basins, and 27 manholes.
Additionally, the project included the construction of a 5,250-foot-long, 10-foot-wide asphalt multi-use path and 4,700 square feet of 4-inch concrete sidewalks, as well as restoration work aimed at improving pedestrian connectivity and accessibility throughout the area.