KEM and the City of Ontario worked together to come up with a new design for the existing road in Marshall Park by creating a new alignment south of the parking lot to eliminate the existing safety hazards. The project included new full-depth asphalt pavement, resurfacing, planing, the replacement of parking lot pavement markings, signage, and new guardrail.
Challenges arose when excavating for the new roadway. After cutting the proposed road to grade, it was observed that stumps and other organic material remained embedded in the subgrade. After further investigation and excavations, it was concluded that a large number of trees had been buried within the project limits. This issue was addressed with additional subgrade excavation and the use of geotextile bridging and 304 backfill to ensure that the roadway was structurally sound.
KEM provided construction inspection services to assure compliance with contract plans, requirements, and specifications. Written logs of project activities and verification of quantities placed were performed daily. KEM provided quality assurance testing to verify compliance with specifications. In addition, KEM conducted progress meetings, approved material submittals, processed change orders, and prepared pay estimates for the City's approval.