Lexington-Springmill Road Resurfacing, Ontario

KEM was selected to provide construction contract administration and inspection services for the RIC-CR 133-5.78 Lexington-Springmill Road resurfacing project. The scope of this project included 2.66 miles of pavement planing, resurfacing, and pavement markings.

Lexington-Springmill Road Resurfacing, Ontario

Project Details

Client
City of Ontario
Location
Ontario
Year
2019
Status
Completed

In addition, 25 catch basins would be rebuilt, and new loop detection devices would be installed at existing traffic signals.

Project Photos

June 2019 8 photos
  • Lexington-Springmill Road Resurfacing, Ontario, June 2019, photo 1 of 8
  • Lexington-Springmill Road Resurfacing, Ontario, June 2019, photo 2 of 8
  • Lexington-Springmill Road Resurfacing, Ontario, June 2019, photo 3 of 8
  • Lexington-Springmill Road Resurfacing, Ontario, June 2019, photo 4 of 8
  • Lexington-Springmill Road Resurfacing, Ontario, June 2019, photo 5 of 8
  • Lexington-Springmill Road Resurfacing, Ontario, June 2019, photo 6 of 8
  • Lexington-Springmill Road Resurfacing, Ontario, June 2019, photo 7 of 8
  • Lexington-Springmill Road Resurfacing, Ontario, June 2019, photo 8 of 8
April 2019 4 photos
  • Lexington-Springmill Road Resurfacing, Ontario, April 2019, photo 1 of 4
  • Lexington-Springmill Road Resurfacing, Ontario, April 2019, photo 2 of 4
  • Lexington-Springmill Road Resurfacing, Ontario, April 2019, photo 3 of 4
  • Lexington-Springmill Road Resurfacing, Ontario, April 2019, photo 4 of 4

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053