Project Details
- Client
- City of Vermillion
- Location
- Vermilion
- Year
- 2019
- Status
- Completed
- Photos
- 14 photos ↓
The scope included the construction of a 127.5′ single span I-beam bridge over the Norfolk Southern Railroad, which included 22 drilled shafts to support the bridge substructure and over 9,000 cubic yards of embankment. Six hundred feet of new drainage conduit was installed as well as two bioretention areas and several catch basins. Nine hundred and sixty feet of 16″ waterline with 2″ air release valves were installed and completed with minimal service disruptions. Roadway reconstruction, guardrail installation and landscaping completed the project. KEM worked proactively with the surrounding property owners and Norfolk Southern Railroad to ensure clear communications. The project was completed on time and within the allocated budget.