
Aidan Hanna
Project Engineer
Aidan is a civil engineer who designs and analyzes water and wastewater infrastructure: sewer systems, collection systems, pump stations and treatment plants. At KEM he helps prepare engineering reports, construction plans, specifications and cost estimates, and coordinates regulatory submittals for municipal water and wastewater projects.
Featured Projects
Main Street Streetscape, Mansfield
KEM has been selected by the City of Mansfield to design a comprehensive sidewalk and infrastructure improvement project in downtown Mansfield.
Marengo Sanitary Sewer Improvements
K.E. McCartney & Associates, Inc. (KEM) was engaged by the Village of Marengo to develop improvements to its sanitary system to allow for future expansion and growth.
Mansfield Water Treatment Plant Engineering Services
The City of Mansfield engaged KEM to provide comprehensive engineering services for its Water Treatment Plant.
Mansfield Water Treatment Plant Rehabilitation
KEM was selected to provide design and construction administration services for the City of Mansfield's Water Treatment Plant Improvements Project.
Rocky River Stormwater Master Plan, NEORSD
As part of the Project Team for the Rocky River Stormwater Master Plan, KEM is conducting remote and physical walk-through CCTV inspections of approximately 30,000 linear feet of culverted streams which have both small and large diameter storm sewers.
Hayesville Water Treatment Plant
The Village of Hayesville engaged KEM to develop a General Plan for improving their water treatment plant (WTP).
Main Street Streetscape, Mansfield
KEM has been selected by the City of Mansfield to design a comprehensive sidewalk and infrastructure improvement project in downtown Mansfield.
Marengo Sanitary Sewer Improvements
K.E. McCartney & Associates, Inc. (KEM) was engaged by the Village of Marengo to develop improvements to its sanitary system to allow for future expansion and growth.
Mansfield Water Treatment Plant Engineering Services
The City of Mansfield engaged KEM to provide comprehensive engineering services for its Water Treatment Plant.
Mansfield Water Treatment Plant Rehabilitation
KEM was selected to provide design and construction administration services for the City of Mansfield's Water Treatment Plant Improvements Project.
Rocky River Stormwater Master Plan, NEORSD
As part of the Project Team for the Rocky River Stormwater Master Plan, KEM is conducting remote and physical walk-through CCTV inspections of approximately 30,000 linear feet of culverted streams which have both small and large diameter storm sewers.
Hayesville Water Treatment Plant
The Village of Hayesville engaged KEM to develop a General Plan for improving their water treatment plant (WTP).
Ontario Water Asset Management Plan
The City of Ontario engaged KEM to develop and implement a comprehensive plan to safeguard the municipal water supply system by mitigating existing threats and preventing new risks to the wellfield.
Trimble Road Trail Tunnel
KEM designed the Trimble Road trail extension tunnel for the City of Mansfield.
Cuyahoga River North Stormwater Master Plan, NEORSD
KEM is part of a project team providing field services for NEORSD’s Cuyahoga River North SWMP.
Grove Avenue Waterline Replacement, Lorain County
The County faced recurring water main breaks along Grove Avenue, the lowest point in their service area with the highest water pressures.
Butler Wastewater Treatment Plant Improvements
KEM was engaged by the Village of Butler to revise the design of their new wastewater treatment plant (WWTP), expanding its capacity and relocating it to accommodate a Regional WWTP.
Boone Road Sewer & Pump Station
KEM was hired by the Lorain County Sanitary Engineering department to examine the options for extending sanitary sewer service along Snell Road and Boone Road, located in Columbia Township, to serve multiple planned and future developments within the township.


